Connecting to a sewer

泡芙云打不开-快连vρn加速器

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

泡芙云打不开-快连vρn加速器

泡芙云打不开-快连vρn加速器

鲸鱼加速器下载地址,鲸鱼加速器官网网址,鲸鱼加速器免费永久加速,鲸鱼加速器不能用了  极客加速器官网,极客加速器破解版,极客加速器npv,极客加速器vn  全球节点免费加速器官方网址,全球节点免费加速器电脑版下载,全球节点免费加速器npv,全球节点免费加速器2024  easylink加速器官网,easylink加速器电脑版下载,easylink加速器免费试用,easylink加速器打不开了  绿豆加速器ios下载,绿豆加速器电脑版下载,绿豆加速器vnp,绿豆加速器2024年  金牛座加速器破解版,金牛座加速器官网网址,金牛座加速器电脑版下载,金牛座加速器vn  西部世界加速器最新版,西部世界加速器vnp,西部世界加速器打不开,西部世界加速器vp  789加速器电脑版下载,789加速器免费试用,789加速器vps,789加速器vn